During next Tuesday’s Select Board meeting, the board will be given a brief update on the MBTA’s proposed turnback track installation. The MBTA is proposing the new construction of approximately 4,500 lineal feet of turn-back track adjacent to existing mainline track within the existing railroad right-of-way and existing railroad ballast. Below is an aerial drone video we shot of the area where the proposed track is to be installed as well as the surroundings in question.